Liquid Granite | Application method

Professional Installation Sequence

Ready for use in about 2 days — full hardness in 7 days.

Surface Grinding

01

Surface Grinding

Mechanically grind the concrete to remove laitance, weak layers and contamination.

Dust Removal

02

Dust Removal

Vacuum thoroughly until the substrate is clean, dry and dust-free.

Primer Application

03

Primer Application

Apply WERKON Primer (Liquid Granite R) evenly by roller and avoid puddles.

Add Part B to Part A

04

Add Part B to Part A

Pour the complete pre-measured Part B into Part A. Use full packs only.

Mechanical Mixing

05

Mechanical Mixing

Mix with a slow-speed paddle for approx. 3 minutes until homogeneous.

Pour onto the Floor

06

Pour onto the Floor

Pour the mixed material immediately in a continuous ribbon over the primed floor.

Spread with Steel Trowel

07

Spread with Steel Trowel

Pull and level the wet material to the specified thickness.

De-air with Spiked Roller

08

De-air with Spiked Roller

Use a spiked roller within the working time. Wear spike shoes on the wet floor.

Liquid Granite | Application method

Ready for use in about 2 days — full hardness in 7 days.

Day 0

Application

≈ 8 h

Initial setting

≈ 24 h

Final setting

≈ 2 days

Ready for use

7 days

Full hardness

Designed for trained hands, not rare artists.

Much easier to apply than conventional decorative resin floors, with no need for rare artistic skills. A trained applicator can deliver a perfect result.

Floors that perform longer.

Tell us about your space. We'll prepare a material estimate and a tailored quote.